Project Scheduler
Piketon, OH
Full Time
Experienced
Title: Project Scheduler
Job ID: 1030
Location: Onsite- Piketon, OH- Per Diem available for those who qualify
Start: Immediately, Long-term assignment
Must be US Citizen
Scope
This position will work closely with project managers, engineers, procurement staff, construction managers, contractors, and other project services staff to provide detailed planning and scheduling of projects from conceptual planning through engineering and construction.
Requirements:
Preferred:
Responsibilities:
Job ID: 1030
Location: Onsite- Piketon, OH- Per Diem available for those who qualify
Start: Immediately, Long-term assignment
Must be US Citizen
Scope
This position will work closely with project managers, engineers, procurement staff, construction managers, contractors, and other project services staff to provide detailed planning and scheduling of projects from conceptual planning through engineering and construction.
Requirements:
- Bachelor’s degree in Engineering or Construction Management (or related field) or experience equivalent
- 8+ years of scheduling experience
- P6- Oracle Primavera P6, version 17.7 or later
Preferred:
- Knowledge of General ledger (accounting) systems & data – Deltek Costpoint preferred
- DOE EM EVMS experience including development and implementation of system requirements/ configuration, integration between P6 and COBRA, monthly reporting
Responsibilities:
- Develop and maintain resource-loaded schedules, including lists of activities, major milestones, critical approvals, long-lead procurement items, and other critical project deliverables to be scheduled and tracked for the projects.
- Develop schedule logic and realistic activity durations.
- Analyze available manpower and resources, commodity charts, trends, schedule variations, schedule performance, and schedule forecast.
- Assess the impact(s) of design changes and schedule slippages and inform company management and clients of all schedule updates.
- Apply vast knowledge of engineering, procurement, and construction terminology and concepts to develop and maintain critical path logic networks; accumulate and access historical data for use in maintaining realistic future planning and forecasting.
- Provide guidance, direction, and specialized assistance for the resolution of difficult project control problems.
- May interface with clients, attend regular meetings.
- Support DOE EM EVMS certification CAMP closure
- Support field PC personnel with systems, data generating/analysis, and EVMS training
- Procedure development for Project Controls functions that are EVMS compliant, including desktop guide development
- Develop and maintain lower-level data merged from the various business systems to support field analysis
- Ability to communicate well with all levels of management and field personnel both in written and verbal formats
pmXperts, Inc is an equal opportunity employer.
M/F/D/V
Apply for this position
Required*